Major Investment Projects

Construction of Usinskaya-1 mine with coal preparation plant

About the project:
Construction of a mine and coal preparation plant with a capacity of 4 million tons per year. The issues of investment, design and development of the subsurface area are being discussed, including the question of possible national support for the project.

Project capacity by the optimistic scenario will equal 4 million tons of coal.

Initiator:
Vorkutaugol

Investment:
59 826 million RUB

Timeframe:
2021-2030

Port Vera Coal Marine Terminal

About the project:
Nameplate capacity amounts to 20 million tons. All the necessary design and estimate documentation has been developed, a positive conclusion from Glavgosexpertiza of Russia has been obtained, as well as a construction permit. Construction on the terminal site has already begun.

Initiator:
Vostok Coal

Timeframe:
Project capacity is expected in 2022.

West-Taimyr industrial cluster producing coal concentrates from coking coal

About the project:
The project implies construction of a coal-preparation plant for deep coal processing (production of coal concentrates from coking coal), a marine terminal, an airport, a shift camp, a power plant, and a highway. The Syradasayskoye coal field is located 105-120 km south-east of the village of Dikson on Taimyr, field reserves are estimated at more than 5 billion tons. The first 200 thousand tons of coal are planned to be shipped in 2021. In 2022, it will produce 1.25 million tons of coal.

Initiator:
Severnaya Zvezda.

Investment:
about 100 billion RUB.

Timeframe:
2040

Construction of mining and processing complex, Denisovskaya mine

About the project: Expansion of the operating Denisovskaya mine (the central part of Denisovsky field); construction of a new Vostochnaya Denisovskaya mine in the eastern part of Denisovsky field; construction of a coal preparation plant
Initiator: Kolmar

Investment: 32.1 billion RUB

Timeframe: before 2027

Construction of a specialized coal transshipment complex

About the project:
In March 2020, phase 1 of the specialized coal transshipment complex VaninoTransUgol was completed in the port of Vanino (Muchke Bay). The capacity is 12 million tons per year. Once phase 2 is completed in 2022, the capacity will double.

Initiator:
VaninoTransUgol

Timeframe:
2022

Beysky coal cluster

About the project:
Coalstar plans to establish an industrial cluster on the premises of the Beisky field, which it is currently developing. The company is building Mayrykhsky and Beisky-Zapadny coal mining complex within the existing sites, which will increase production at Beisky by a factor of 5, and coal transportation should reach 20 million tons. As part of the project, the field will develop railway and energy infrastructure. Maxim Vinogradov, head of the Mayrykhsky Open-pit management Company, said that the company is now working closely with Russian Railways as part of the Eastern Polygon expansion program.

Initiator:
Coalstar

Investment:
50 billion RUB.

Timeframe:
2030

Request the full list of Investment Projects

    Please note that due to our internal policy we are not entitled to send any materials to personal emails (Yahoo, Yandex, Google, etc.)

    If you have any questions, please contact us:

    +44 207 394 3090 (London)

    Where did you hear about this event?